Jaipur: There is sweet information for the account holders who’ve supplied their land for the land pooling scheme within the state. Account holders will be capable of make most use of the land acquired as compensation. The land pooling legislation was applied within the 12 months 2016 in the course of the earlier BJP authorities to implement the land use proven within the grasp plan of cities and for the deliberate growth of an space. Later its guidelines have been notified.
At current two land pooling schemes have been proposed within the state capital Jaipur. Of these, a land pooling scheme has been proposed on 163.5 hectares of land in Shivdaspura space and on 172.31 hectares of land in Diggi-Malpura Road space. First of all allow us to offer you detailed details about these two schemes.
–Land pooling scheme has been proposed on 172.31 hectares of land in Phagi Road space.
-Ring Road is the outer highway of the scheme on the north-east border of this scheme.
-Diggi Malpura highway is on the south-east border of the scheme.
-On the south-west border of the scheme, there’s a highway connecting Diggi Malpura Road to Jaisinghpura alias Tejawala.
-This highway is a proposed 30 meter broad highway of the Zonal Development Plan.
-On the north-west border of the scheme, there’s a highway connecting the income village Achrawala, Jaisinghpura alias Tejawala and Abhaypura Ring Road scheme.
-This highway is a proposed 30 meter broad highway of Zonal Development Plan.
-This scheme consists of the land of Achrawala, Tejawala and Abhaypura villages.
-JDA has launched the draft plan of this scheme to ask objections and recommendations.
-Second land pooling scheme has been proposed on 163.51 hectare land in Shivdaspura space.
Under the land pooling scheme, roads starting from 40 ft to 200 ft broad have been proposed.
-200 ft and 300 ft broad highway of Zonal Development Plan has been proposed in direction of Tonk Road.
-Whereas then again, a 100 ft broad highway has been proposed in direction of Barkheda.
-Most of the land of the scheme has residential land use within the grasp plan.
-While the remaining land is leisure, public and semi-public land use.
-Objections and recommendations have been invited on the draft plan of this scheme.
-After disposal of those, the plan was despatched to the federal government for approval.
-The state authorities has permitted the plan, however has not but appointed the Land Pooling Officer.
-Due to this the work of constructing the ultimate plan has not began.
In each these land pooling schemes, so far as doable the account holders might be given compensation for the developed land from their very own land. But the account holder can use the utmost portion of the land acquired as compensation. JDA is getting ready to ship a proposal to the state authorities concerning this. Let us inform you what proposal might be despatched by JDA to the state authorities and why it’s essential to ship this proposal.
-According to the draft plan of Land Pooling Scheme of Shivdaspura, 46.60 % developed land might be given as compensation to the affected account holders.
-Similarly, in line with the plan of land pooling scheme of Diggi Malpura Road, about 49 % land might be given to the affected account holders as compensation.
-There is a preparation to provide just one block of developed land to the account holders in alternate for the land of 1 account.
-In such a state of affairs, if the account holder creates a plot on his land, then will probably be essential to observe the provisions of the township coverage.
-It might be essential to observe the availability of 60:40 ratio between plot and facility space.
If 40 % of the land acquired as compensation goes into the highway and facility space, the account holders may have much less land accessible for creating plots.
Due to this, JDA is getting ready to ship a proposal to the state authorities to provide rest on this provision.
-Under this proposal, the account holder might be required to offer land just for the highway on the developed land.
-Town planning consultants imagine that in your entire land pooling scheme, there’s a provision to order land for parks and different amenities.
-In such a state of affairs, there isn’t any want to order land for your entire facility space on the compensation land.